The ski ramp lets an aircraft get away at lower speed but also at a lower lift coefficient than needed for sustained horizontal flight, so at a lower induced drag. This gives it time to accelerate in the air enough to reach horizontal flying speed even in the case of failure of the critical engine at the moment the wheel chocks are retracted by the ship. That is the concept behind the use of a ski ramp with multi-engine aircraft. You will have to differentiate between the case of take off with engine failure when the aircraft drops its external stores two seconds after leaving the ramp and that without engine failure. In current ships the aircraft with engine failure at the beginning of the take off run will leave the ramp with about 60% of the speed in the case without. With cats the difference might be zero as the cat senses the acceleration at any moment and compensates.
I choose 70% of the speed at which aircraft are launched according to USN norms because that gives a nice factor of 2 in the length of the cat, but the real speed norm will have to be decided by the designers based on simulations. Perhaps the speed might be less but the size of the ski ramp in Adm K and Liaoning seems to be half of the length of a USN cat.
I learned the principles of the use of ski ramps at university in lectures about V/SOL aircraft design some forty years ago.
As you have said, the aircraft leaves the ski ramp at a lower speed. This is a great disadvantage, considering the goal is to actually get an aircraft to leave at the highest speed possible. Also, you pointed out that the aircraft needs to accelerate after leaving the ramp to attain horizontal flying speed. It means the take off run isn't shortened, just that part of the run is moved overboard. A catapult on the other hand truly shortens the take off run.
Even when we suppose your concept can reduce take off length, a catapult can always reduce that length more by having the power cranked up further. Essentially, your concept will always get beaten with a straight forward solution, rendering your concept infeasible.
Add to this that a ski ramp takes up valuable deck space for spotting...and a lot of it.We've had this discussion before.
An USN C41 steam Catapult can launch an A6-E with twenty four 500(226kg) pound bombs and a full centerline tank... what more do you need?
An Nimitz class with 4 C41 catapults can launch, if need be , four fully laden aircraft every two to four minutes. I see no need for a cat with an ski ramp. EMAL or steam.
Liaoning's Provincial Party Committee Secretary has just said publicly that "after the commissioning of the Liaoning, China's second home-constructed aircraft carrier will start construction at Dalian, with an estimated construction cycle of 6 years, together with 2 other 052D guided-missile destroyers. "
First, this MAY or MAY NOT be reliable. But I believe it should be as it corresponds to what we have known so far (North and South each will build a carrier, with the North start the construction of 052Ds). Although the number of 052Ds does differ from what we have known (2 vs 4).
Second, in the original report what he said was "国产" which literally translates into "country-made" or "country-produced" or "country-manufactured". So, by "second" he could mean that Liaoning is the first OR he could mean that the carrier at Shanghai has already started construction (which may be those structures we have seen in photos).
These are just some of the possible interpretations of his words and some of my own speculations. Do take it with a grain of salt.
her rank and higher power than the governor. Also, many provincial level or municipal cities' party chiefs, especially young and capable ones from important places such as Shanghai, will eventually rise to the most powerful elite Politburo Standing Committee, or even become premier or Party General Secretary, who's also the President, and Chairman of the Central Military Co
For those who are not familiar with Chinese system, a provincial party committee secretary (also known as "party-chief") is the highest level party official in a province. Although the provincial governor is the head of government, the "party-chief" has actually higmmittee.
News link:
More likely it would be the former, methinks, given most people qualify shipbuilding start as keel laying and subcomponents are usually created outside of "awareness" whereas fitting out is generally included in the "construction time".
But this entire thing is still as suspect as any other carrier construction rumour.
More likely it would be the former, methinks, given most people qualify shipbuilding start as keel laying and subcomponents are usually created outside of "awareness" whereas fitting out is generally included in the "construction time".
But this entire thing is still as suspect as any other carrier construction rumour.