PLA Navy news, pics and videos

by78

General
High-resolution photos of underway replenishment...

26591935530_d78d9a96cd_o.jpg
26591936020_cd7eb0549c_o.jpg
26591937100_892a81e4b8_o.jpg
26259290474_31424e1cdf_o.jpg
26259291084_41c5e09e39_o.jpg
 

mangjitok

New Member
Registered Member
The second one looks to me especially interesting. Is the propeller to be fitted on the extension below the keel?
it maybe a rudder combine with something like sonar for tracking underwater. it seem like device installing at ACTUS, Darpa developed unmanned submarine hunter. i'm not to sure, maybe i fail
 

Jeff Head

General
Registered Member
The next two posts document what the Chinese indigenous crrier has done through 2015 and thus far in 2016. It will also punctuate why I believe that the carrier will not officially launch until late 2017 at the earliest, and more likely 2018.

Here are five pictures from mostly last year detailing progress:

PLAN-1stCarrier-build-001.jpg PLAN-1stCarrier-build-002.jpg PLAN-1stCarrier-build-003.jpg PLAN-1stCarrier-build-004.jpg PLAN-1stCarrier-build-005.jpg

Through this period we saw the hull growing up to the hanger deck and then the hanger being placed.
 

Jeff Head

General
Registered Member
This second post details later events, mostly this year in 2016 here into mid-May. Where we have seen the sections for the flight deck overhang being prepared and the first two placed, and then further extension of the forward part of the vessel up to that deck.

PLAN-1stCarrier-build-006.jpg PLAN-1stCarrier-build-007.jpg PLAN-1stCarrier-build-008.jpg PLAN-1stCarrier-build-009.jpg PLAN-1stCarrier-build-010.jpg

The last pic shows the approximate progress to date.

They still have to extend the flight deck out over its sponson completely to the stern, and then forward to the forward weapon sponson on that side. They then have to add that sponson and the other weapons and auxillary sponsons around the ship.

Then they have to build the rest of the flight deck forward including the ski jump.

At some point during, or fter all of this, they will add the island.

Finally, they have a LOT of internal wiring, structure, HVAC/Plumbing and work to do interior to the ship to hook it all together.

Only then (normally) will the vessel be launched. I believe they have over year's worth of work to do that...as much as two from this point.

Then they will spend months, perhaps a year completing the outfitting once it is launched before it goes to sea for its intial builders trials.

We will watch that happen...but there is not rushing it.
 

SinoSoldier

Colonel
Fresh rumors from the "big shrimps", in order of relative "importance":

- Steel cutting has begun for the Type 002 CV
- The Type 055 will be "seen" by 2016 (not sure what this means, the statement could be either implying launch or that we will "see" it being built)
- Steel cutting may begin for the Type 054B at the end of 2016
- A 5000-ton catamaran has been launched
- Sister ship of 88 Xu Xiake will be out of the dock soon
- More Type 071s will be built
- A smaller cousin to the Zubr LCAC (named "Stallion") will follow the Type 071s
- Construction of Type 052Ds, 054As, and 056s continue
- Construction of Zubr LCACs continue

001A的稳步进展,已经很多人坐不住了。002的“实验分段”(不是试验哦)也已经开始切了。
055很多人问了一次又一次,说今年看的见就一定看的见。

海军大邮轮88的妹妹也快成型出坞了,大大的901也在继续。

052D,54A,056也在继续。搞不好054B也在今年底开始切板了。

野牛听说是仿制定了。

大山和野马(比野牛小,叫马可以吧)接着下
5000的双体也下了,这玩意回头你们就知道多好了。

我们之前望眼欲穿的东西今年底前基本都齐全了。一大票的货,也就小平顶慢点(估计慢不少,反正也不急)

Make of it what you will.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
Fresh rumors from the "big shrimps", in order of relative "importance":

- Steel cutting has begun for the Type 002 CV
- The Type 055 will be "seen" by 2016 (not sure what this means, the statement could be either implying launch or that we will "see" it being built)
- Steel cutting may begin for the Type 054B at the end of 2016
- A 5000-ton catamaran has been launched
- Sister ship of 88 Xu Xiake will be out of the dock soon
- More Type 071s will be built
- A smaller cousin to the Zubr LCAC (named "Stallion") will follow the Type 071s
- Construction of Type 052Ds, 054As, and 056s continue
- Construction of Zubr LCACs continue



Make of it what you will.

That all seems fairly reasonable, and fzgfzy has an excellent track record, especially after his 001A posts last year.
 
Top