It makes sense in the context of probably being a larger more modern design. The E-2 base design will turn 70 in 2030, for perspective is like keeping Sopwith Camels in service in the 1980's.don't believe this has been shared before. A procurement document for a training simulator for the KJ-600 indicates that it has four operator consoles, which is one more than the E-2.
 
				 
 
		 
 
		
 
 
		 
	 
	 
	 
 
		 
	