The continued delay could mean one of two things ...
1. There will be structural changes to the Thunder design. Something which doesn't warrant Block-lll to be defined as a new aircraft. Could possibly be something along the lines of what was done with the Super Hornets or Gripen-NG. It is plausible, the longer Block-llls takes, it can be more than plausible. Whether there is an engine change, remains to be seen. If there is an engine change, then it can explain structural changes. At best, a variant of WS-13 or RD-93MK-2.
2. Delays come due to lack of finances. Such delays were also rumored to have taken place with the Al-Khalid tank production. Even though HIT has the capacity to churn out greater number of tanks per month, it was rumored that lack of funding prevented it.
More likely scenario could be the latter rather than the former.
1. There will be structural changes to the Thunder design. Something which doesn't warrant Block-lll to be defined as a new aircraft. Could possibly be something along the lines of what was done with the Super Hornets or Gripen-NG. It is plausible, the longer Block-llls takes, it can be more than plausible. Whether there is an engine change, remains to be seen. If there is an engine change, then it can explain structural changes. At best, a variant of WS-13 or RD-93MK-2.
2. Delays come due to lack of finances. Such delays were also rumored to have taken place with the Al-Khalid tank production. Even though HIT has the capacity to churn out greater number of tanks per month, it was rumored that lack of funding prevented it.
More likely scenario could be the latter rather than the former.