What updates can we expect?
New AESA radar? New WS-10 engines (I heard the old engine was not as reliable as PLA liked, but not sure)?
We need more larger and more clear photos and source coming, I guess it should be installed AESA radar.
What updates can we expect?
New AESA radar? New WS-10 engines (I heard the old engine was not as reliable as PLA liked, but not sure)?
definitely it’s fits for the EMALS of 003What updates can we expect?
New AESA radar? New WS-10 engines (I heard the old engine was not as reliable as PLA liked, but not sure)?
yeah h've seen this img on top81 forumIf this is indeed another, better one it clearly shows to lack the catapult gear however.
View attachment 64831View attachment 64832
yeah h've seen this img on top81 forum
yes guess it’s still for the No.16.17 carrier glad it’s not ,really hope the real new J15 throw pitot tube awayBut at least I don't see a catapult gear?!
yes guess it’s still for the No.16.17 carrier glad it’s not ,really hope the real new J15 throw pitot tube away
imo this green J15 img is just an old picture,罪恶大天使 said it has improved radar and WS10h via weibo guess J15B & J35 still have time before type003 commissionedSo batch 3 and 4 is another 24 x J15
so new are not for 003?
It means J15B is for 003
Which means they are simultaneously working on J15 + J15B ?
something isn’t adding up
why not build batch 3 and 4 in 2017,2018 when we were all asking where is the next batch
and now all of a sudden we have so many J15!
so to summarise
batch 3 + 4 = 24 aircraft for CV-17
and 36 x J15B for 003
It would be a good idea tactically to have multiple squadrons worth of fighters and other carrier aircraft (KJ-600 AEW, J-15D EW aircraft, and Z-18/Z-20 ASW+SAR helicopters) to form up a couple (probably 3-4?) air wings, and have these air wings rotate deployments aboard the PLAN's growing carrier fleet. For the air wings that are not deployed on a carrier, their respective squadrons can use the down time on shore to rest, replenish, train, and prepare for future deployment cycle out at sea.So batch 3 and 4 is another 24 x J15
so new are not for 003?
It means J15B is for 003
Which means they are simultaneously working on J15 + J15B ?
something isn’t adding up
why not build batch 3 and 4 in 2017,2018 when we were all asking where is the next batch
and now all of a sudden we have so many J15!
so to summarise
batch 3 + 4 = 24 aircraft for CV-17
and 36 x J15B for 003