That's the IAC 2.Something will get delayed. I an telling you now.
Engine produced domestically?And atleast 6 Project 18 Class Super Destroyesr are planned and six Follow on. Each will weight more than 13,000 Tonnes. The project is fastracked and MDL silently expanded it's Shipbuilding capacity for the increase Shipbuilding capacity. Most of the System would be Indeginious including the Weapona and Sensors unlike the previous ones and engine produced domestically.
Almost everything will get delayed.Something will get delayed. I an telling you now.
Which design has been selected for diesel electric submarine? An self designed one or..And more 3 Kalvari Class Submarine are planned to produce until the Next Prokect 75 I and Project 75 K start productions.
Under license.Engine produced domestically?
Which one?
13,000 tons means type 055 competitor.
Any design studies?
Project 75 k will have the design from the Project 75 I but with Indeginiously design and most of the system indeginious.Almost everything will get delayed.
Which design has been selected for diesel electric submarine? An self designed one or..
What exactly is the P 75 K?
You can see the interviews of the DRDO's and various articles. And officialy funded fir design and developmental phase. And design study has been done. UVLs is under study recently I found a UVL's design but can't share as it doesn't belong to me. And about timeline kids depends on the approval.@HaldilalSDF
I went through your posts in Indian Defence Forum regarding Project 18.
There you say that Project 18 will be superior to type 055.
You sound very elated there. But many of the specs you lay down are mere speculations at best. What's the source of the news?
IEPS? with what technology base?
Which powerplant?
What's the exact weight?
Is the project even official?
Has there been any design study?
Other things like UVLS etc remain just mysteries.
Is it truly a product that'll materialize in the coming decade?
Design study has been done?!You can see the interviews of the DRDO's and various articles. And officialy funded fir design and developmental phase. And design study has been done. UVLs is under study recently I found a UVL's design but can't share as it doesn't belong to me. And about timeline kids depends on the approval.
I don't have it now will post once I get it's.Design study has been done?!
Post it here.
It will be very helpful.
Yes GE LM 2500+ license is with the HAL and another marine engine with less power for the Next Generation Frigates is being developed by the Kirloskar Engine's. Will post once more details are available.@Haldilal
Regarding the powerplant - I guess the engine and IEPS would be British MT30, Queen Elizabeth class and Type 45 Destroyer of UK.
If that's the case, I have doubts about license production. It is beyond Indian capabilities.
India license assembles GE LM 2500+ series, right?