Can we have translation? I do not know Chinese.
Translation below, cutting off blabs, so it's much shorter. hahaha

Since October, the Jiangnan Shipbuilding Group's test-run boiler room project equipment installation work has fully entered the critical stage of rushing to catch the node and sprint to protect the task. The Wuxi Distributed Thermal Power Department sounded the clarion call for a full sprint.
At present, the Jiangnan project has entered a critical period and a decisive battle period, and there is less than one month left before the end of the year. Time is tight and tasks are heavy. Due to the continuous adjustment of the owner's plan in the early stage of the project, the supply plants have been delayed under the influence of the general environment, and a lot of time was delayed in the early stage, which caused the time left for subsequent installation and commissioning to be greatly compressed. In addition, the cross-operation between the rectification of the remaining problems in the civil engineering acceptance phase and the installation of our equipment has become a huge influencing factor that severely restricts the installation process.
 

snake65

Junior Member
VIP Professional
Translation below, cutting off blabs, so it's much shorter. hahaha

Since October, the Jiangnan Shipbuilding Group's test-run boiler room project equipment installation work has fully entered the critical stage of rushing to catch the node and sprint to protect the task. The Wuxi Distributed Thermal Power Department sounded the clarion call for a full sprint.
At present, the Jiangnan project has entered a critical period and a decisive battle period, and there is less than one month left before the end of the year. Time is tight and tasks are heavy. Due to the continuous adjustment of the owner's plan in the early stage of the project, the supply plants have been delayed under the influence of the general environment, and a lot of time was delayed in the early stage, which caused the time left for subsequent installation and commissioning to be greatly compressed. In addition, the cross-operation between the rectification of the remaining problems in the civil engineering acceptance phase and the installation of our equipment has become a huge influencing factor that severely restricts the installation process.
What would be the " continuous adjustment of the owner's plan in the early stage of the project"? Initial plans called for different type of powerplant?
 