CV-18 Fujian/003 CATOBAR carrier thread

Orthan

Senior Member
It seems from the first picture that they are uniting the modules. This is always a critical time, when the modules must fit almost perfectly well.

The second picture must be older, cause i dont see the second module.

Actually, the second photo is a repost from a photo posted on october 9. I havent been able to find the first photo in the older photos, but i wonder if it is a repost too.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
A new image of the first Type 003 aircraft carrier under construction.

Are these already segments of the deck?

(Image via @正版河图 from Weibo)

20191116_114252.jpg img-f3ff67bc3e9938463b8dad3e68941295.jpg
 

Orthan

Senior Member
A new image of the first Type 003 aircraft carrier under construction.

This photo seems to suggest that they have made little progress since july. The amount of modules looks to be the same. I wonder if they have already united those modules already in place.

What i find weird is why those semi-assembled cranes keep appearing and dissapearing from the photos that are posted in this forum.
 

Orthan

Senior Member
What we can see so far is the underwater ship. The structures on the site next to the modules may be for the gallery deck. But I suspect, these are assemblies for the 2nd to 4th Deck.

There is still a LOT of the underwater hull to assemble. I dont think that they will start the construction of the upper decks before they have the lower hull completed.

What i find weird is why those semi-assembled cranes keep appearing and dissapearing from the photos that are posted in this forum.

Heh. I didnt realize that some photos are taken from the front and others from the back of the hangars. Thats why i didnt see the cranes when the photos are taken at the back of the hangars.
 

Gustaf Adolf

New Member
Registered Member
So why does it take so long to construct the first type 002? One type 075 was built from scratch far faster than this one. The type 002 is more than twice as big and more complex than the type 075 but it couldn't explain the far longer construction time.
 

Intrepid

Major
So why does it take so long to construct the first type 002? One type 075 was built from scratch far faster than this one. The type 002 is more than twice as big and more complex than the type 075 but it couldn't explain the far longer construction time.
075 was ready planned when construction began. 003 will be redesigned during the construction. Besides, the construction dock and the way there is not finished yet. They just started to build, although they still have a lot of time. Maybe because the necessary resources were without any other work.
 

Orthan

Senior Member
075 was ready planned when construction began. 003 will be redesigned during the construction. Besides, the construction dock and the way there is not finished yet. They just started to build, although they still have a lot of time. Maybe because the necessary resources were without any other work.

What are you talking about? redesigned ? not finished yet ? without any other work?

So why does it take so long to construct the first type 002? One type 075 was built from scratch far faster than this one. The type 002 is more than twice as big and more complex than the type 075 but it couldn't explain the far longer construction time.

You are right. Basicaly, it seems that they are stuck since july. Those 2 big pieces, it seems that they still arent connected, why is that? who knows.

But now, they have a lot of material there, there seems to be a module in construction in the back, and now they have added a crane there. So who knows if construction will pick up now?
 

asif iqbal

Lieutenant General
Those are blocks yes but not flight decks whoever said that is wrong and has no idea about carrier construction

I know about carrier construction two Queen Elizabeth carriers were built infront of me
 