How do we know that this is the 3rd prototype? the 2nd one only flew in december.
As far as I know this is actually the third aircraft to be numbered 20003 but the second One only to fly with 20002 Most likely a static one.
How do we know that this is the 3rd prototype? the 2nd one only flew in december.
As far as I know this is actually the third aircraft to be numbered 20003 but the second One only to fly with 20002 Most likely a static one.
Any latest update on engines??????
3rd prototype is also using Russian engines.
Ask again in another 20 years.
The first batch of Y-20 will most likely use Russian D-30 engines. The WS-20 is still some years away.
I wonder why China was never interested in the AN-124.
Ask again in another 20 years.
They can (and did) charter or lease from Russian and Ukrainian carriers when there's occasionally a need to fly oversized cargo.
By 2015 Y-20 will be test flying with WS-20, and mass production begin in 2018 !!!