China's overland Silk Road and Maritime Silk Road Thread

timepass

Brigadier
Please, Log in or Register to view URLs content!


New ZNRV Break Vans and Hopper wagons manufactured at Carriage Factory
Please, Log in or Register to view URLs content!
for Pakistan
Please, Log in or Register to view URLs content!
...

27545182_1998147803787077_6057902099795992161_n.jpg


26994375_1998147920453732_6290219861675436638_n.jpg


26993923_1998147993787058_5873867000133255057_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


An image just before the evening shift starts, all the labour and staff gather together for a safety briefing (安全教育). A Safety First (安全第一) culture is integral part of work at Hub project site.

CPHGC 1320MW Coal Power Plant
China Pakistan Economic Corridor - CPEC

27066730_1998354713766386_5339031740052668199_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


Five New Airline in Pakistan....The New Airlines that will be operational in the span of one year are Askari Air, Air Siyal, Go Green, Liberty Air and Afeef Zara Airways.

The New Airlines will probably start from low profit and distant destinations like Skardu, Chitral, Gilgit, Bannu, Parachinar, Gwadar, Turbat, Panjgur, Khuzdar, Dalbandin, Zhob, Rawalakot, and Muzaffarabad.

Aviation industry of Pakistan will grow at the rate of 19% yearly and this is forecast to grow up till 2020.The open skies policy has been very productive for the industry as well as people’...

The current fleet sizes of operating carriers in Pakistan:

PIA has 45 aircraft...

pakistan-international.jpg


Shaheen Air has 23...

Shaheen-Airbus-330.jpg


Air Blue has 19...

airblue_A340-300_aircraft.jpg


Sarene Air has 05...

serene_1.jpg


Indus Air has 03...

air-indus.jpg
 
Last edited:

timepass

Brigadier
Please, Log in or Register to view URLs content!


The inside view of 8.5 km long
Please, Log in or Register to view URLs content!
Two way Road Tunnel...Lowari Tunnel – the lifeline for Chitral..

It took at least four hours to cross the Lowari Pass via the back-breaking road towards Chitral. On the way back, the same mountain was crossed in just nine minutes through the tunnel with much comfort..

27073003_1998867137048477_9032219840381423131_n.jpg


27067718_1998867170381807_3552619096765739211_n.jpg
 
Top