That is interesting.
If they're going with a new building hall, it should be able to sustain construction of 1 submarine per year.
So what is happening with the old building hall?
Easily 2-3 at the same time
New nuclear submarine construction building soon to be commissioned
This means only one thing China has serious plans nuclear submarines Type 095 and Type 096
Both long term plans
Well, with a Type 093 being:Internal dimensions of the (finally assembly) building: area 40,260 m^2, length 288 m, width 135 m.
Also, as part of the overall project, the building for constructing pressure hull modules: area 35,446.48 m^2, length 204.6 m^2, width 172.755 m. Bid time at the end of 2015, duration of the construction is 540 days.
That is interesting.
If they're going with a new building hall, it should be able to sustain construction of 1 submarine per year.
So what is happening with the old building hall?
This means only one thing China has serious plans nuclear submarines Type 095 and Type 096