What I really wanna know is if we might see a second stack at some point…
Because if you’re going to build and operate both nuclear and conventionally powered carriers at the same time, then now is the time to think about ditching steam for GTs (previously steam boilers helped as a nice technological, operational, and crew training stepping stone on the path to CVNs).
If you remove the stack behind the island (and maybe a second stack yet-to-be-built, or that we can’t see), then it’s a CVN. If you have the 2 stacks, then it’s a gas turbine powered CV.
With the 2 types of carriers having similar overall footprints and island locations (with the CVNs being a little larger and higher in displacement).