China's transport, tanker & heavy lift aircraft

lcloo

Major
That's then some 150 airframes made in 10 years. Compare that to some 280 c17 made in 25 years. Pretty good pace. And first few Years aren't representative of later production pace anyway.
Imagine 10 years ago PLAAF had only 20 plus IL-76 air frames, and with some of these air frames converted to be used as KJ-2000 and flying testbeds.

PLAAF's huge strategic air lift expansion and capability to move rapidly troop transfer from one regional theatre to another theatre thousands of km away is a great game changer. 10 years is a short time for such dramatic change. Instead of weeks, one day or two would be sufficient to move a full brigade of troop and equipment from coastal China to Tibet.
 
Last edited:

ACuriousPLAFan

Lieutenant General
Registered Member
There have also been hints from our good old friend on Weibo that the annual production rate of the Y-20 has likely reached 30+ units by now, if not in recent years.

In the meantime, depending on whether the claimed/rumored new common platform aircraft will become a reality + How fast can the Sino-C-5 join PLAAF service in considerable numbers in the coming years, the Y-20's production rate could vary, going forward.
 
Last edited:

Deino

General
Staff member
Super Moderator
Registered Member
So there are 150 Y-20s out?

Thought they were sitting around 110 or so right now.


Liekly, even if per my list we have confirmed "only" 116 ...

12th AR / 4th TD: 25 Y-20A, 3 YY-20A, 10 Y-20B = 38
37th AR / 13th TD: 20 Y-20A, 13 Y-20B = 33
38th AR / 13th TD: 38 YY-20A
--------------------------------------
55 Y-20A, 38 YY-20A, 23 Y-20B (as of late May 2026) = 116 individual aircraft
 

sunnymaxi

Colonel
Registered Member
Liekly, even if per my list we have confirmed "only" 116 ...

12th AR / 4th TD: 25 Y-20A, 3 YY-20A, 10 Y-20B = 38
37th AR / 13th TD: 20 Y-20A, 13 Y-20B = 33
38th AR / 13th TD: 38 YY-20A
--------------------------------------
55 Y-20A, 38 YY-20A, 23 Y-20B (as of late May 2026) = 116 individual aircraft
these are confirmed Y-20s.. but what could be the total number if we add unseen aircrafts. ? because you said i have seen many Y-20Bs but can't post the pic.
 

Deino

General
Staff member
Super Moderator
Registered Member
these are confirmed Y-20s.. but what could be the total number if we add unseen aircrafts. ? because you said i have seen many Y-20Bs but can't post the pic.

Well, the ones shown in that image I am not allowed to post are already included in that list; what i however did not list are about 20 additional Y-20B at XAC, that were not yet delivered in January since several of them are likely the more recently confirmed ones. The point is, there are surely a few not yet confirmed by serial number and as such the list could be likely (changes to above in bold):


12th AR / 4th TD: 25 Y-20A, 3 YY-20A, 17 Y-20B = 45
37th AR / 13th TD: 20 Y-20A, 20 Y-20B = 40
38th AR / 13th TD: 38-42 (maybe 45) YY-20A
--------------------------------------
55 Y-20A, about 40-45 YY-20A, 37 Y-20B (as of late May 2026) = 132-137 individual aircraft

But again, that's just my conservative guess!
 

Deino

General
Staff member
Super Moderator
Registered Member
150 comment was based on Huitong's blog gallery where various Y20 serials are listed, with small gaps between serials spotted assumed to be planes not photographed.

I know, however especially the YY-20A list is strange, has still (after years) some strange missing number or even blocks of numbers and overall unlikely has the full complement of 50 aircraft.
 
Top