Do we know what the considerable number of parts stacked next to the dock are for?The 3rd 054B FFG under construction at Hudong-Zhonghua. Posted by @星依樱未 on Bilibili.
View attachment 170471
Do we know what the considerable number of parts stacked next to the dock are for?
Bottom right, shows blocks to support 2 more.The 3rd 054B FFG under construction at Hudong-Zhonghua. Posted by @星依樱未 on Bilibili.
View attachment 170471
Bottom right, shows blocks to support 2 more.

CSSC Changxing Shipyard Phase II Project: No. 2 Dry Dock Lengthening and Modification ProjectFrankly, besides the confirmation that there's a third ship, what surprises me most is that they're apparently extending the dry dock to the rear! Was that known, or did I just miss it again?
View attachment 170534
The main construction activities include: Demolishing the existing 200m × 92m final assembly area; Extending the existing 440m × 92m × 13.1m No. 2 dry dock northward by 220m into the land area; Constructing two new final assembly areas at the stern and side of No. 2 dry dock (measuring 200m × 93.7m and 200m × 42.2m respectively).