maozedong
Banned Idiot




下面是来自东北某著名高校网站上的一则新闻:
2008年1月26号,我校承担的“神光III原型装置”关键系统之一-“靶场光电及控制系统”顺利通过由中国工程物理研究院激光聚变研究中心在四川绵阳组织的验收。验收专家组由八所游泳副总师、张小民所长、郑万国副所长、三部魏晓峰主任以及中物院十二所、中科院西安光机所等单位的专家组成。项目总师吕志伟教授、机电学院梁迎春院长、科技处赵航副处长带领项目组成员20余人与会。
验收专家组一致认为,我校项目组通过采用“基于高分辨率共轭式靶面传感器的靶定位与多光束弹着点精确引导与任意调控技术、基于先进机器人的自动换靶技术以及以打靶流程为牵引的靶场光机电集中控制等一系列先进的靶场综合控制技术”,实现了光束引导闭环化,打靶流程程序化,数据管理自动化,具备了开展物理实验的能力。通过原型装置两年试运行以及两轮物理实验考核,其主要性能和技术指标达到外协任务书和合同书要求,一致同意项目通过验收。
该项目集合了航天学院、机电学院、电气学院等多家单位形成了跨学科、交叉学科的研究团队,是我校参加国家中长期科技发展规划的十六个重大项目之一。伴随着“神光III原型装置靶场光电及控制系统”的验收,“神光III主机装置靶场光电与控制系统”也顺利通过了预评审,为下一步的工作打下了良好的基础。
News from China NorthEast Universty Well-known websites:
January 26, 2008, our school, "SG-III prototype device" one of the critical systems - "range photoelectric and control system" passed by the Chinese Academy of Engineering Physics laser fusion research center in Mianyang, Sichuan Province organizations acceptance. Acceptance Group by the 8th institute deputy chief Yeu Yong, director Zhang Xiaomin, deputy director Wan-Guo Zheng, director of 3nd department Xiao-Feng Wei,12th physics institute,Chinese Academy of Sciences Xian Photoelectric machinery institute units composed of experts .the project head engineer Lu Zhiwei, the Electrical and Mechanical College president LIANG Yingchun, Technology Services Department Deputy Director Zhao Hang members led more than 20 members of the project team participants.
The group agreed that acceptance, our school projects through the use of group "based on the high-resolution conjugate of the target surface sensor target positioning and multi-beam footprint arbitrary precision guidance and control technology, based on advanced robot automatic target-shooting process technologies, as well as to triggered by the shooting range of optical and electrical machinery, such as centralized control of a comprehensive range of advanced control technology, "and to realize the beam guide loop, targeting process procedures, and data management automation, with the ability to conduct physics experiments. A prototype device, as well as two two-year trial run physics experiment examination, and its main properties and technical indicators have reached the mandate of the Association and the contract requirements, it was agreed that the project through acceptance.
The project brings together space flight academy, and the Electrical and Mechanical College, the Institute of Electrical and a number of units of the interdisciplinary, cross-disciplinary research team, I participated in school and long-term national science and technology development planning one of the 16 major projects. Along with "SG-III prototype optoelectronic devices range and control system" acceptance "Shenguang III mainframe range optoelectronic devices and control system" smooth passage of a pre-assessment for the next phase of the work to lay a good foundation.
Last edited: